Installation day

How to install fresh sod

Fresh sod is perishable. Organize material, labor, tools and watering so the first rolls do not dry while the last area is still being fitted.

01

Stage the work

Walk the final grade, run irrigation and plan where pallets can be unloaded without blocking the work. Have knives, rakes, wheelbarrows and a light roller ready.

02

Install promptly

USU advises laying delivered sod within 24–48 hours. In hot, dry or windy weather, organize for same-day installation and protect waiting rolls from drying. The Sod Farm’s qualifying first-24-hour remedy requires installation and watering within six hours of delivery or pickup.

03

Start straight and stagger seams

Begin along the longest straight edge. Lay rows in a brick pattern so end seams do not line up. Place edges tightly together without overlapping or stretching the sod.

04

Cut from the soil side

Fit curves, irrigation boxes and obstacles with clean cuts. Avoid tiny slivers at exposed edges when a larger piece can be planned.

05

Roll for contact

Use a light roller after placement to press the sod evenly against the prepared soil. Correct raised edges or voids that can dry out or scalp during mowing.

06

Water through the sod

Begin watering as workable sections are completed. Pull back a corner and verify that water has moved through the sod into the underlying soil.

Sources & useful tools

Use current local restrictions and the instructions that come with your order when they are more specific.

USU lawn care resources ↗The Sod Farm customer policies →

Related guide

Keep the root zone moist while it establishes.

Use soil moisture—not a rigid clock alone—to guide the first 10–14 days.

Open the watering guide →